Premium Only Content
This video is only available to Rumble Premium subscribers. Subscribe to
enjoy exclusive content and ad-free viewing.
Central heating 900A using an engcon titrator, city gas 400A
3 years ago
13
The working video was very late due to a tour of the Enkon plant in Sweden. We are also editing a Swedish website video, so please wait a bit^^ This is a 4K video about filling the road for 900A central heating, 400A LNG gas. Water compaction during sand backfilling Because there are many obstacles up and down, and the diameter of the TS panel drawing operation is large, the backfilling time seems to be twice as long as other operations. A section of road is a job that always requires a lot of attention, as there are space restrictions and obstacles up and down. Thanks a lot for watching.
Loading comments...
-
56:00
Julie Green Ministries
2 hours agoTHE REAL REASON PRESIDENT TRUMP NEVER CONCEDED THE 2020 ELECTION
28K113 -
1:30:18
Game On!
17 hours ago $2.77 earned2025 Sports Equinox Did NOT Disappoint!
8.45K1 -
7:02
Adam Does Movies
18 hours ago $4.79 earnedIT: Welcome To Derry Episode 1 - Review
24.7K3 -
9:05
Millionaire Mentor
16 hours agoTrump EXPOSES Obama and Biden LIVE As Jim Jordan Backs Him Up
13.1K8 -
1:34
WildCreatures
1 day ago $4.17 earnedMajestic Spotted Eagle Rays Fly Past Scuba Diver in the Galapagos Islands
10.8K8 -
2:05:15
BEK TV
23 hours agoTrent Loos in the Morning - 10/28/2025
13.5K2 -
32:13
Stephen Gardner
15 hours ago🔥Schumer SHUTDOWN Backfires as Trump CRUSHES Democrats!!
56.8K26 -
30:24
Liberty Hangout
7 days agoNo Kings Protestors Go CRAZY: Part 1
53.9K81 -
42:08
The Why Files
2 days agoLincoln Conspiracy: a Diary, a Mummy and The Escape of John Wilkes Booth
36.1K32 -
24:42
James Klüg
3 days agoAnti-Trump Protester HITS Grandma Thinking She’s With Us
26.5K19