Premium Only Content

Artemis I Path to the Pad- The Rocket
As of my last update in September 2021, "Artemis I" was a planned mission by NASA, part of the broader Artemis program, which aimed to return humans to the Moon and eventually send astronauts to Mars. Please note that mission plans and details may have evolved since then, so I recommend checking with official NASA sources or the latest news for the most up-to-date information.
"Artemis I" was intended to be an uncrewed test flight that would pave the way for future human missions. It would use the Space Launch System (SLS), which is a powerful new rocket designed by NASA for deep space exploration. The SLS would carry the Orion spacecraft, which would be the spacecraft used for crewed missions to the Moon and beyond.
The path to the launch pad for "Artemis I" would involve several stages, including:
Vehicle Assembly: The various components of the SLS and Orion spacecraft would be manufactured and assembled at different facilities. The completed rocket stages and spacecraft would then be transported to the launch site.
Integration: At the launch site (most likely NASA's Kennedy Space Center in Florida), the individual rocket stages and spacecraft would be integrated, stacked on top of each other, and checked for proper connections and functionality.
Testing: Before the actual launch, the fully integrated stack would undergo a series of tests to ensure everything works as expected. These tests might include functional checks, electrical tests, and simulated countdown exercises.
Rollout to the Pad: Once all tests are successfully completed, the fully assembled and tested SLS/Orion stack would be transported from the integration facility to the launch pad. This transfer is often done using specialized crawler-transporters.
Final Preparations: At the launch pad, the rocket would undergo final preparations for launch, including fueling with propellants and configuring the payload fairings.
Launch: After all systems are verified, and weather conditions are favorable, the rocket would be ready for liftoff. "Artemis I" would then launch from the pad and begin its mission.
Given the complexity of space missions, unexpected delays or adjustments in the timeline are not uncommon. Therefore, it is essential to refer to NASA's official updates for the latest information on the "Artemis I" mission, including the specific path to the launch pad and the status of the mission.
-
1:02:02
The Nick DiPaolo Show Channel
8 hours agoTrump’s Success Rattling Lefties | The Nick Di Paolo Show #1804
30.2K26 -
2:49:33
TimcastIRL
8 hours agoDemocrat Call On Liberals To 'FORCEFULLY RISE' Against Trump, DHS ATTACKED In Chicago | Timcast IRL
236K113 -
2:50:07
Badlands Media
14 hours agoDEFCON ZERQ Ep. 013: Global Shifts, Spiritual Warfare, and the Return to Source
58.7K64 -
6:21:11
SpartakusLIVE
9 hours agoLIVE from SUPER SECRET, VIP Location || BEACH FRONT into Verdansk
75.1K7 -
1:20:01
Flyover Conservatives
1 day ago"The Testosterone Levels of a Baby Bird" - America’s Health Crisis w/ Dr. Troy Spurrill | FOC Show
46.6K1 -
2:28:15
PandaSub2000
1 day agoSonic Racing CrossWorlds | ULTRA BESTIES & GAMES (Original Live Version)
29.4K1 -
4:56:36
Drew Hernandez
11 hours agoDISGRACED SCOTUS REJECTS ALEX JONES' INFOWARS FREE SPEECH APPEAL
41.8K21 -
3:58:57
GrimmHollywood
10 hours ago🔴LIVE • GRIMM'S TUESDAY FRIGHT NIGHT with LEEMIDA • LITTLE NIGHTMARES 3 • PART 1 •
16.8K -
2:20:19
FusedAegisTV
8 hours agoGame & Rant #69 | CNN Mad Men Like To Look At Women, Nurse Joy Blackface? WTF Pokémon
11.6K1 -
45:11
MattMorseTV
9 hours ago $27.88 earned🔴Dems. MELT DOWN over LEAKED MESSAGES.🔴
99.4K110