How To 2nd Fix A Fuse Board With SPD Tutorial 🧑🔧
Second-fixing a fuse board, also known as a consumer unit in the UK, is the process of making the final connections, ensuring everything is in its proper place, and testing the unit for safe operation. Here's a step-by-step guide to second-fixing a fuse board. Please note that this is a simplified overview, and working with electrical installations should only be done by qualified individuals:
Safety First: Always ensure the main power supply is turned off before working on a fuse board. It's best to use a voltage tester to double-check there's no current flowing to the board.
Mount the Consumer Unit: If not already in place, mount the consumer unit securely to the wall.
Install Circuit Breakers:
Slot in the necessary circuit breakers (MCBs, RCCBs, or RCBOs) according to the planned layout of circuits.
Make sure each breaker matches the current rating for its specific circuit.
Connect the Main Earth and Neutral Bars:
Attach the main earth (ground) wire to the earth bar.
Connect the neutral wires from the different circuits to the neutral busbar.
Connect the Live Wires:
Connect the live wires from the different circuits to their respective circuit breakers.
Connect the Main Live and Neutral:
Attach the main live wire (coming from the electricity meter or main cut-off switch) to the main switch or RCD of the consumer unit.
Attach the main neutral wire to the neutral bar.
Neatness and Management:
Use cable trunking or conduit, if necessary, to manage and protect wires leading into the consumer unit.
Ensure cables are neatly organized within the consumer unit, with no excess slack.
Labelling: Clearly label each circuit breaker with its corresponding area or appliance (e.g., "kitchen sockets," "upstairs lights").
Testing: Before powering on, use a continuity tester to check connections. Once powered on, use a loop impedance tester and insulation resistance tester to ensure everything is safe. Check RCDs with an RCD tester.
Power On: Once satisfied with all connections and initial tests, switch the main power back on and check each circuit's functionality.
Final Checks and Certification:
Conduct final safety checks.
In the UK, electrical work must adhere to the Wiring Regulations (BS 7671). After installation, it is necessary to fill out an Electrical Installation Certificate or Minor Work Certificate, as appropriate, and have the installation checked by a qualified person or inspector.
Warning: Working on a consumer unit and electrical circuits can be hazardous. Always consult with, or hire, a qualified electrician. Electrical installations in the UK must meet specific regulatory standards, and unauthorized or incorrect installations can be both illegal and dangerous.
-
21:17
Tool Box Talk For Electricians
8 months agoLED Lighting Job Setup: Transforming Spaces with Efficiency 💡⚡
392 -
LIVE
Awaken With JP
40 minutes agoAmerica Rocked by Charlie Kirk Death - LIES Ep 108
1,188 watching -
1:05:13
Russell Brand
2 hours agoReporting From Tommy Robinson’s ‘Unite the Kingdom’ March - SF634
65.3K38 -
5:56
Buddy Brown
2 hours agoThis is Why Everyone's Googling September 23rd! | Buddy Brown
2.17K10 -
LIVE
Human Events Daily with Jack Posobiec
53 minutes agoHUMAN EVENTS DAILY WITH JACK POSOBIEC
1,228 watching -
UPCOMING
Michael Heaver
1 hour agoGermany’s Seismic Result Serves WARNING
11 -
1:02:14
SGT Report
16 hours agoGOD'S ORDER VS. SATAN'S CHAOS -- Dr. Henry Ealy
21K30 -
2:03:13
The Charlie Kirk Show
3 hours agoMichael Knowles, Matt Walsh, and Ben Shapiro Remember Charlie Kirk | 9.16.2025
383K313 -
2:11:49
Steven Crowder
5 hours agoThe Lies are Sick: Charlie Kirk's Legacy Separating Fact from Fiction
487K378 -
1:22:10
Sean Unpaved
2 hours agoMNF Mayhem: Bucs' Stunner, Brady's Booth Drama, Shedeur's Draft Doge & the Masters on Prime
21.9K1