Wye Track Realignment - Part 1
Visit our store! https://santaferatonsub.square.site/
We decided to enlarge the reversing section of our Wye so we could turn an entire train around. The job entailed a lot more work than we thought.
After we got into the project and started laying the new track, we decided to give the right-hand curve of the Wye a wider radius. This would make it easier for large locomotives like Madame Queen to pass through the small #4 wye switch. Realigning the right-hand curve of the wye also required us to remove more of the original reversing section track to make everything come out right. The job ended up taking us (my son and I) 6 days.
All the steps required to complete this task are in this video and will be a handy reference for anyone wanting to make track changes to fully completed scenery areas of their model railroad. Just like any remodeling project, you must tear out the old before you can install the new. We spent a lot of time tearing out the original HO scale track, roadbed, roads, trees etc. down to the original Styrofoam base of our benchwork.
Then we had to level out the areas where new track would be installed and start putting everything back together.
Final testing of the newly realigned wye track was done with AT&SF 2-10-4 Steam Locomotive #5000 (Madame Queen). Madame Queen is the largest locomotive used on our layout. Her ten-coupled drivers are a great way to test new curves and turnouts.
The Wye Realignment is presented in two parts because there is almost two hours of footage covering this project. We hope the information and techniques we used to realign our wye will help you with any changes you want to make on your model railroad. Let us know if it does.
VIDEO CONTENTS:
00:00 Introduction
00:38 Removing original track, road bed and ground cover.
29:45 Start test fitting new cork roadbed with straight pins.
37:05 Making the RH curve radius wider.
49:00 Cutting out ground cover for new reversing section roadbed.
51:03 Removing ground cover for new reversing section roadbed.
56:13 Test fitting cork roadbed for new reversing section route.
59:34 Checking distance between new roadbed.
RECOMMENDED LINKS:
1. https://youtu.be/4ivpv29FCJY 2. https://youtu.be/ijglGJsRq7Q
-
5:23
Santa Fe's Raton Subdivision Model Railroad
6 days agoQuick Tour of Layout, Static Displays and Shop
10 -
LIVE
Russell Brand
1 hour agoThe Truth About UK Corruption – Andrew Bridgen Speaks Out - SF640
10,372 watching -
DVR
Timcast
1 hour agoAnti ICE Shooter Was Kirk Assassin Copycat, FBI Says Attack Was Planned
64.3K48 -
LIVE
The Charlie Kirk Show
1 hour agoDebunking the Lies and Smears about Charlie | ThoughtCrime Team | 9.25.2025
9,141 watching -
LIVE
Sean Unpaved
58 minutes agoCup Swings, Homer Kings, & TNF Zzzz's
177 watching -
2:18:47
Right Side Broadcasting Network
3 hours agoLIVE REPLAY: President Trump Greets Turkey’s President Erdogan - 9/25/25
29.3K17 -
LIVE
Steven Crowder
3 hours ago🔴 They Are Lying Because They Are Losing: ICE Shooter, White People, & ... Bees?
25,148 watching -
LIVE
Side Scrollers Podcast
1 hour agoYouTube ADMITS BLATANT Censorship + California Wants to FINE “Hate Speech” + More | Side Scrollers
357 watching -
UPCOMING
IrishBreakdown
1 hour agoNotre Dame vs Arkansas Game Predictions
11 -
LIVE
DailyClout
2 hours ago"Dr. Henry Ealy: What to Do About Trauma"
55 watching