Premium Only Content

Wye Track Realignment - Part 2
Visit our store! https://santaferatonsub.square.site/
Part 2 - We decided to enlarge the reversing section of our Wye so we could turn an entire train around. The job entailed a lot more work than we thought.
After we got into the project and started laying the new track, we decided to give the right-hand curve of the Wye a wider radius. This would make it easier for large locomotives like Madame Queen to pass through the small #4 wye switch.
Realigning the right-hand curve of the wye also required us to remove more of the original reversing section track to make everything come out right.
The job ended up taking us (my son and I) 6 days. All the steps required to complete this task are in this video and will be a handy reference for anyone wanting to make track changes to fully completed scenery areas of their model railroad.
Just like any remodeling project, you must tear out the old before you can install the new. We spent a lot of time tearing out the original HO scale track, roadbed, roads, trees etc. down to the original Styrofoam base of our benchwork.
Then we had to level out the areas where new track would be installed and start putting everything back together.
Final testing of the newly realigned wye track was done with AT&SF 2-10-4 Steam Locomotive #5000 (Madame Queen). Madame Queen is the largest locomotive used on our layout. Her ten-coupled drivers are a great way to test new curves and turnouts.
The Wye Realignment is presented in two parts because there is almost two hours of footage covering this project. We hope the information and techniques we used to realign our wye will help you with any changes you want to make on your model railroad. Let us know if it does.
VIDEO CONTENTS:
00:00 Introduction
05:52 Using White Latex Caulk to install cork roadbed.
20:40 Airbrush track.
22:45 Add and glue base fill.
24:40 Install ballast.
32:10 Aaron's ground cover technique.
34:34 Install weeds.
42:25 Clean up.
44:44 Test runs with Madame Queen.
RECOMMENDED LINKS:
1. https://youtu.be/4ivpv29FCJY
2. https://youtu.be/ijglGJsRq7Q
-
39:18
Santa Fe's Raton Subdivision Model Railroad
18 days agoThe Depot Workshop - Episode 6, Installing a Helper Pocket at Lynn.
501 -
1:31:41
Redacted News
2 hours agoNew Charlie Kirk Video Evidence Could Change EVERYTHING | Redacted w Natali & Clayton Morris
141K132 -
22:10
Jasmin Laine
2 hours ago"You Promised Them $1BILLION!?"—Liberal Gets LAUGHED Out of Parliament
30011 -
1:54:22
vivafrei
4 hours agoOstrich Farm UPDATE! And Live with Tyler Fischer Talking REAL Cancel Culture He is Experiencing!
154K25 -
31:39
Michael Franzese
2 hours agoAmerica’s Human Trafficking Crisis EXPOSED by Former Mobster
9.4K7 -
LIVE
Wayne Allyn Root | WAR Zone
6 hours agoWatch LIVE: The War Zone Podcast with Wayne Allyn Root
48 watching -
LIVE
The Liberty Lobbyist
3 hours ago"The View From The Top: How Leadership Shapes Legislation and Responds to Activism"
65 watching -
4:59:50
Barry Cunningham
6 hours agoPRESIDENT TRUMP NEEDS TO STAND FIRM AND SHUT THE GOVERNMENT DOWN IF HE HAS TO!
39K36 -
23:45
IsaacButterfield
13 hours ago $0.41 earnedThe Rise of Autism in Gen Z
7.61K12 -
LIVE
LFA TV
1 day agoBREAKING NEWS ALL DAY! | THURSDAY 9/25/25
1,032 watching