Premium Only Content

USING MICROSOFT EXCEL 2016 - Independent Project 3-4 - Classic Garden - Full answer in 2025
USING MICROSOFT EXCEL 2016
Independent Project 3-4
Independent Project 3-4
For this project, you create a column chart to illustrate April–September revenue for Classic Gardens and Landscapes. You
also build a pie chart sheet to graph the proportion that each category contributes to total revenue.
Skills Covered in This Project
Create a chart object.
Size and position a chart object.
Edit and format chart elements.
Edit the source data for a chart.
Build a pie chart sheet.
Use texture as fill.
Add and format data labels in a chart.
Download
start file
1. Open the ClassicGardens-03 start file. If the workbook opens in Protected View, click the Enable
Editing button so you can modify it. The file will be renamed automatically to include your name.
Change the project file name if directed to do so by your instructor, and save it.
2. Create a Clustered Column chart object for cells A4:G9.
3. Move the chart object so that its top left corner is at cell A12. Size the bottom of the chart to
reach cell H30.
4. Edit the chart title to display
CGL Major Sales Revenue on
one line, then press Enter and
type Second and Third Quarters
on the second line.
5. Apply chart Style 14 to the
chart.
6. Format the first line and the
second line of the chart title to
a font size of 20 pt.
7. Apply a ½ point Black, Text 1
outline to the chart area.
8. Verify that the chart is still
selected. In the highlighted
range in the worksheet, drag
the resize pointer to remove
the Design Consulting data
series from the chart
(Figure 3-71).
3-71 Drag the resize pointer to change the chart data
9. Create a 3-D Pie chart for cells A4:A9 and cells H4:H9. Move the chart to its own sheet named
Revenue Breakdown. Hint: Use the Move Chart button [Chart Tools Design tab, Location group].
10. Edit the chart title to display Revenue by Category. Change the font size to 32.
11. Select the legend and change the font size to 12.
12. Apply the Woven mat texture fill to the Patio and Furniture slice.
Excel 2016 Chapter 3 Creating and Editing Charts
Last Updated: 11/16/16 Page 1
Excel 2016 Chapter 3 Creating and Editing Charts Last Updated: 11/16/16 Page 2
USING MICROSOFT EXCEL 2016 Independent Project 3-4
13. Add data labels to display in the center of each slice.
a. Display the Format Data Labels task pane, choose the Accounting format, and set 0 decimal
places.
b. While the data labels are selected, change the font size to 14 pt and apply bold [Home tab,
Font group].
14. Deselect the chart.
15. Save and close the
workbook (Figure 3-72).
16. Upload and save your
project file.
17. Submit project for grading.
Upload &
Save
Grade my
Project
3-72 Excel 3-4 completed chart sheets
-
34:08
Bannons War Room
6 hours agoMEGYN KELLY: Jimmy Kimmel and Sore Cultural Losers, and Charlie Kirk's Spiritual Revival, w/ Bannon
70.3K70 -
59:27
NAG Podcast
7 hours agoBrandon Straka: BOLDTALK with Angela Belcamino
63.7K11 -
59:43
Sarah Westall
5 hours agoVietnam Shuts down 86 Million Bank Accounts, The Fourth Turning & more w/ Andy Schectman
46.4K11 -
1:17:51
Flyover Conservatives
12 hours agoMary Flynn O’Neill and Clay Clark: The Church Must Rise or America Falls | FOC Show
36.8K3 -
3:36:01
I_Came_With_Fire_Podcast
14 hours agoThe Global ANTIFA Connection You've Never Heard Of | The Israel Question
29.4K6 -
16:38
RTT: Guns & Gear
22 hours ago $2.73 earnedExtar EP9 Review: The Best Budget 9mm PCC?
46.6K6 -
7:53
Rethinking the Dollar
14 hours agoMass Firings in Tech: The Real Agenda Behind 166,000 Cuts
53.4K11 -
1:02:28
BonginoReport
9 hours agoFeds Monitor Threats Ahead of Kirk Memorial - Nightly Scroll w/ Hayley Caronia (Ep.138)
260K151 -
55:51
Candace Show Podcast
8 hours agoWho Moved The Camera Right Above Charlie's Head? | Candace Ep 239
115K652 -
13:09:13
LFA TV
1 day agoBREAKING NEWS ON LFA TV! | FRIDAY 9/19/25
263K55