Premium Only Content
Kaohsiung Station 高雄車站 under construction [episode 04] 🇹🇼 (2020-11) {aerial}
Aerial views of Kaohsiung Station construction site mid November 2020, Sanmin District, Kaohsiung City, Taiwan. (Brief update)
#Kaohsiung #station #construction #railway #StationBuilding #TrainStation #development #PublicTransport #railway #infrastructure #documentation #architecture #scenery #TRA #landscape #urban #mecanoo #aerial #uav #drone #SanminDistrict #KaohsiungCity #Taiwan #Asia
https://www.paypal.me/WalterHagemann
Stages of the (above ground visible) Kaohsiung Station 高雄車站 construction works are presented in several episodes.
Episode 06
Status as per 2021, mid February.
The building shell of the first steel frame high rise building is almost completely erected. Installation of the corrugated steel sheets of the floor slabs is ongoing (including some concreting). Access roads west of the station building have been paved and road marking is in place. Planting of vegetation on the former railway track has substantially proceeded.
Video: https://youtu.be/lepvJqYDVzs
Episode 05
Status as per 2020, early December.
Erection of the first steel frame high rise building is continuing. Steel members are being hoisted by mobile cranes. The curvilinear shaped canopy is developing. Vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/BTIwkyDKX-Q
Episode 04
Status as per 2020, mid November.
Erection of the first steel frame high rise building has started. Steel members are being hoisted by mobile cranes. Support structures of the curvilinear shaped canopy are under construction. Roads and cycle paths at the vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/0uhjnBNFghQ
Episode 03
Status as per 2020, early October.
Canopy construction and preparation of the former railway track area.
Video: https://youtu.be/45Vi0-GdYEM
Episode 02
Status as per 2020, end May.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Corrugates steel sheets have been placed as permanent formwork for the canopy.
Video: https://youtu.be/i8uAz_w00dY
Episode 01
Status as per 2020, end March.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Preparatory works are ongoing on the former track areas east and west of the station.
Video: https://youtu.be/ISEwyN3lMb4
************************************************
Architect’s project website:
https://www.mecanoo.nl/Projects/project/170/Kaohsiung-Station?d=0&t=0
Architectural rendering:
https://youtu.be/xnNJcV57cGk
************************************************
Music:
Ben by William Rosati
Youtube Audio Library
-
1:37:33
efenigson
15 hours agoUnapologetically Yourself: The Courage to Speak & Be Different - Zuby | Ep. 111
40.6K2 -
1:07:27
Inverted World Live
6 hours agoAI Person of the Year & Robot Wolves in Japan | Ep. 153
70.5K7 -
3:03:11
TimcastIRL
7 hours agoRob Reiner MURDERED, Son Arrested, Trump Faces Backlash Over Comments | Timcast IRL
273K142 -
1:46:20
megimu32
6 hours agoON THE SUBJECT: Top Christmas Movies That Raised Millennials [Part 1]
46.5K8 -
57:22
Flyover Conservatives
1 day agoChina and India are Draining Silver — Prices Are Responding Fast - Dr. Kirk Elliott; Natural Remedy You Don't Know About - Dr. Troy Spurrill | FOC Show
48.9K6 -
LIVE
MissesMaam
6 hours agoARC NOOBS 💚✨
316 watching -
2:30:28
Anthony Rogers
13 hours agoEpisode 393 - Psychic Readings
24.7K3 -
44:52
Donald Trump Jr.
10 hours agoShip Outta Luck, Plus FBI Foils LA Terror Plot and Much More | Triggered Ep.300
247K120 -
12:50
Dr. Nick Zyrowski
4 days agoThe AMAZING Health Benefits of NAC ( N-Acetyl Cysteine) - Must See!
47.3K20 -
1:15:43
We Like Shooting
19 hours ago $5.79 earnedDouble Tap 440 (Gun Podcast)
26.3K