Premium Only Content
Kaohsiung Station 高雄車站 under construction [episode 08] 🇹🇼 (2021-04) {aerial}
Views of Kaohsiung Station construction site mid April 2021, Sanmin District, Kaohsiung City, Taiwan.
#Kaohsiung #station #construction #railway #StationBuilding #TrainStation #development #ZhongboBridge #publictransport #railway #infrastructure #documentation #architecture #scenery #TRA #landscape #urban #aerial #uav #drone #SanminDistrict #KaohsiungCity #Taiwan #Asia
Support the channel:
https://www.paypal.me/WalterHagemann
Stages of the (above ground visible) Kaohsiung Station 高雄車站 construction works are presented in several episodes.
Episode 08
Status as per 2021, mid April.
Zhongbo Bridge 中博高架橋 superstructure and piers have been completely removed. Scaffolding encasing the tall building being erected. Roof structure assembly has started (south-west). Station building underground work ongoing (north-west).
Video: https://youtu.be/u-0z9Q74UZc
Episode 07
Status as per 2021, early March.
Key event is the begin of dismantling Zhongbo Bridge 中博高架橋. The steel-concrete composite road bridge connected Jhongshan 1st Road in the south and Boai 1st Road in the north of the station's track and platform area. The temporary bridge went into operation in May 2003 and was closed for traffic at 00:00 o'clock of 27 February 2021. The bridge once had taken the vehicular traffic from a tunnel under the railway tracks, which was permanently closed in connection with the MRT station construction works. 06:00 o'clock on 2021-03-08 newly built Jhansi Road 站西路 was opened for traffic (west side of the new station building). The works for rerouting the traffic from the bridge to the street have been carried out within a tight schedule of about nine days. This became possible due to good planning of the activities and mobilization of plenty of construction equipment (including mobile cranes, excavators, asphalt milling machines, rollers, pavers, and rollers).
Video: https://youtu.be/Jodo0QNCS2U
Episode 06
Status as per 2021, mid February.
The building shell of the first steel frame high rise building is almost completely erected. Installation of the corrugated steel sheets of the floor slabs is ongoing (including some concreting). Access roads west of the station building have been paved and road marking is in place. Planting of vegetation on the former railway track has substantially proceeded.
Video: https://youtu.be/lepvJqYDVzs
Episode 05
Status as per 2020, early December.
Erection of the first steel frame high rise building is continuing. Steel members are being hoisted by mobile cranes. The curvilinear shaped canopy is developing. Vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/BTIwkyDKX-Q
Episode 04
Status as per 2020, mid November.
Erection of the first steel frame high rise building has started. Steel members are being hoisted by mobile cranes. Support structures of the curvilinear shaped canopy are under construction. Roads and cycle paths at the vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/0uhjnBNFghQ
Episode 03
Status as per 2020, early October.
Canopy construction and preparation of the former railway track area.
Video: https://youtu.be/45Vi0-GdYEM
Episode 02
Status as per 2020, end May.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Corrugates steel sheets have been placed as permanent formwork for the canopy.
Video: https://youtu.be/i8uAz_w00dY
Episode 01
Status as per 2020, end March.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Preparatory works are ongoing on the former track areas east and west of the station.
Video: https://youtu.be/ISEwyN3lMb4
************************************************
Architect’s project website:
https://www.mecanoo.nl/Projects/project/170/Kaohsiung-Station?d=0&t=0
Architectural rendering:
https://youtu.be/xnNJcV57cGk
************************************************
Music:
Over Time by Audionautix
License: Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/by/4.0/
Artist: http://audionautix.com/
Antarctica by Audionautix
License: Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/by/4.0/
Artist: http://audionautix.com/
-
1:13:11
Chad Prather
16 hours agoGratitude That Grows in Hard Ground: A Thanksgiving Message for the Soul
55.8K36 -
LIVE
LFA TV
12 hours agoLIVE & BREAKING NEWS! | WEDNESDAY 11/26/25
3,313 watching -
1:59:03
The Chris Salcedo Show
13 hours ago $7.55 earnedRemembering Rush On A Truly American Holiday
21.8K1 -
36:24
Julie Green Ministries
4 hours agoLIVE WITH JULIE
80.2K179 -
1:05:27
Crypto Power Hour
12 hours ago $7.60 earnedWhat You Need To Know About Gold Tokenization
58.2K7 -
1:46:14
LIVE WITH CHRIS'WORLD
12 hours agoTHE WAKE UP CALL - 11/26/2025 - Episode 14
25.7K2 -
2:16:19
The Bold Lib
15 hours agoBOLDCHAT: Trump Pardons | DOGE | Patel w/ANGELA BELCAMINO
36.3K6 -
47:14
Brad Owen Poker
1 day ago $2.39 earnedI Have STRAIGHT FLUSH vs Flopped NUTS!! ALL IN w GOLD BRACELET LEGEND!! $15,000+! Poker Vlog EP 358
24.9K -
36:11
Uncommon Sense In Current Times
19 hours ago $5.49 earnedThe Truth About the Abortion Pill | Sue Liebel Exposes FDA Failures & Hidden Dangers
38.3K2 -
2:05:12
BEK TV
1 day agoTrent Loos in the Morning - 11/26/2025
23.1K